Project Description

Work Package 9

Word package number WP9
Type of activity Research and technological development including scientific coordination
Wordk Package title Platform Development and Integration
Start month 4
End month 26
Lead beneficiary CIMA Research Foundation

 

Objectives

The objectives of the this WP are:

  • compile a list of global data sets useful for the RASOR tool given its global scope and reach;
  • design of an efficient IT system architecture for data exchange consultation and analysis, with a special focus on data interoperability and accessibility in accordance with the harmonisation policies;
  • tools and services integration into IT web-based system with focus on the pilot case studies;
  • design of a validation of the services implemented in the IT system;
  • interaction with the Global Earthquake Model (GEM) for possible re-use of best practices in geospatial archiving of risk, vulnerability and hazard data.
  • interaction with the Global Earthquake Model (GEM) for possible re-use of best practices in geospatial archiving of risk, vulnerability and hazard data.

 

List of Tasks

T9.1 – Global datasets analysis, Interoperability and accessibility requirements [Months: 1-4]
T9.2 – IT system architecture design [Months: 3-6]
T9.3 – Operational implementation [Months: 6-28]
T9.4 – Specification of services validation protocol [Months: 9-19]
 
 

List of deliverables

Deliverable
Number
Deliverable Title Lead beneficiary Nature Dissemination
level (*)
Delivery
date
D9.1 Data and Software Standards CIMA Research Foundation Report PP 3
D9.2 Global Datasets analysis CIMA Research Foundation Report PP 3
D9.3 System architecture design ACROTEC SRL Report PP 8
D9.4 First RASOR prototype ACROTEC SRL Prototype RE 12
D9.5 Second RASOR prototype ACROTEC SRL Prototype RE 19
D9.6 Validation protocol definition CIMA Research Foundation Other PP 20
D9.7 RASOR Final tool ACROTEC SRL Other PP 28
D9.8 RASOR User Manual (1st release) CIMA Research Foundation Report PU 19
D9.9 RASOR User Manual (2nd release) CIMA Research Foundation Report PU 28

 
(*)
PP -> Restricted to other programme participants (including the Commission Services)

RE -> Restricted to a group specified by the consortium (including the Commission Services)
PU -> Public

Related files
Support Document to RASOR User Manual (1st version)  Download
WP: WP9 - Task: T9.3 - Deliverable: D9.8 - Status: Complete - Commission: n.a. - by cima
Support Document to RASOR User Manual (2nd version)  Download
WP: WP9 - Task: T9.3 - Deliverable: D9.9 - Status: Complete - Commission: n.a. - by acrotec